top of page

A VISION OF THE FUTURE: HEATH PARK

Part of the winning team providing Environmental and Low Carbon Infrastructure design input to the WINNING entry.

 

3 teams shortlisted to final phase to redesign the 60 acre site of the Heath Business and Technical Park, Runcorn to become a sustainable, resource conscious masterplan . 

studio4215 was responsible for weaving together environmental design at all scales - site wide joined-up infrastructure loops (water, energy, waste) and block/ building specific environmental design principles.

Role: Environmental and Infrastructure consultant

bottom of page